Skip to content
NewsPaksh

One story from every newsroom

Live

Nepal Flood: 933 Hydropower Project Workers Missing, Rescue Operations Intensify

Rescue operations have intensified in Nepal to locate 933 hydropower project workers and laborers who have been out of contact since August 26 due to floods. As of Monday, the sixth day of the floods, Nepali rescue teams are working day and night to extract people trapped in project tunnels. The National Disaster Risk Reduction and Management Authority (NDRRMA) reported 933 individuals missing from hydropower projects in flood-affected areas. So far, 279 people have been rescued from various project tunnels, including 254 from the Upper Trishuli-1 project and 18 from the Langtang Khola project. The status of others remains unknown, and three bodies have been recovered from two tunnels.

QaSB

2 paksh1 article

Sagarmatha Everest Zone, Nepal, Himalayas
File photo: Vyacheslav Argenberg / CC BY 4.0, via Wikimedia Commons

Key Facts

  1. 933 hydropower project workers and laborers are missing in Nepal.Not in the filings
  2. The individuals have been out of contact since August 26 due to floods.Not in the filings
  3. Rescue operations have intensified to locate the missing workers.Not in the filings
  4. 279 people have been rescued from various project tunnels.Not in the filings
  5. 254 people were rescued from the Upper Trishuli-1 project.Not in the filings
  6. 18 people were rescued from the Langtang Khola project.Not in the filings
  7. Three bodies have been recovered from two tunnels.Not in the filings
  8. The National Disaster Risk Reduction and Management Authority (NDRRMA) reported the missing individuals.Not in the filings

What Happened

Rescue operations are underway in Nepal to find 933 hydropower project workers and laborers who went missing after floods on August 26. Nepali rescue teams are actively working to extract individuals trapped in project tunnels, with 279 people already rescued from various projects, including 254 from Upper Trishuli-1 and 18 from Langtang Khola.

The National Disaster Risk Reduction and Management Authority (NDRRMA) confirmed the number of missing individuals. Three bodies have also been recovered from two tunnels, while the status of the remaining missing persons is still unknown.

Your reaction

One reaction per reader. Tap again to take it back.

About This Analysis

One summary, built from every source. No single newsroom's voice.

2
Paksh
1
Articles
8
Key facts

Paksh: the sides a story is told from. 2 newsrooms filed on this one, and every filing is listed above.

Related